Audubon Mountain: October Trail Crew Update

The Audubon crew continued working through demanding terrain this month, constructing 1,181 feet of new trail while navigating rocky slopes, dense root systems, deep layers of forest duff, and frequent bluffline features. Much of the month’s progress required careful excavation and trail shaping in conditions that often proved more challenging than the footage totals alone might suggest.

Early in the month, construction moved through rugged terrain dominated by rocks, roots, and increasingly deep duff. These thick organic soils required additional effort to reach stable mineral soil suitable for long-term trail sustainability. The crew also installed a rock step to help manage elevation changes and improve trail usability through a steeper section.

As work continued, the difficult conditions persisted. Rocky and root-filled terrain remained the norm, while the deepening duff layer added another layer of complexity to the construction process. Despite these challenges, the crew maintained steady progress and continued advancing the alignment.

The most technically demanding work came later in the month as the trail traversed areas adjacent to bluff rock. These sections required extensive cribbing to support the outer edge of the trail bench and create a stable tread. The crew also constructed a series of rock steps to safely manage elevation changes where grades became steeper. Trail building in these areas demanded precision and careful attention to both sustainability and the hiking experience.

By the final week, crews were balancing several labor-intensive tasks, including additional cribbing, installation of eight more rock steps, removal of mountain laurel and tree stobs, and construction beneath bluff features that constrained trail placement. While these technical trail structures slowed daily production, they will provide long-term durability and improve trail accessibility through challenging terrain.

The crew also received a special visit toward the end of the month from a couple of trail angels who stopped by with goodies to show their appreciation and brighten the crew’s day. These thoughtful visits are a great reminder of the community of supporters who help keep the Cumberland Trail moving forward.

By month’s end, the crew had completed 1,181 feet of new trail, overcoming difficult conditions and constructing significant trail infrastructure along the way. The crib walls and rock steps installed this month will help ensure the trail remains sustainable, resilient, and enjoyable for future hikers.